Elevating preservation battery for Herods (Moria) public beach
Status בביצוע
Elevating the public beach battery in accordance with the fixed level including the arrangement of drainage infrastructure and elevating a barrier in the beach area, landscaping rehabilitation of the beach and arranging the interface between the hotel yard and the elevated beach battery.
Planned end date: September 2015