Elevating the segment from kilometer 202 to 204, including junction p44, for protection against flooding and drainage problems. The project includes the relocation of communication, electricity and water (Mekorot) infrastructures, earthworks to elevate the road and upgrade water transfers.
Planned end date: September 2015
An integrated project of transportation infrastructure and tourism infrastructure, elevating Road 90 while providing an answer for protection from flooding and drainage issues, a combination of earthworks and paving and the placement of water transfers with the establishment of a 4 kilometer promenade parallel to the road including shading at the southern end of the Dead Sea in accordance with the standards of the National Roads Company.
Planned end date: december 2015
Elevating the public beach battery in accordance with the fixed level including the arrangement of drainage infrastructure and elevating a barrier in the beach area, landscaping rehabilitation of the beach and arranging the interface between the hotel yard and the elevated beach battery.
Planned end date: decmber 2015
Elevating the public beach battery in accordance with the fixed level including the arrangement of drainage infrastructure and elevating a barrier in the beach area, landscaping rehabilitation of the beach and arranging the interface between the hotel yard and the elevated beach battery.
Planned end date: September 2015
Elevating and expanding the Meridian public beach battery, landscaping rehabilitation of the beach, making it accessible to bathers and arranging it to prevent flooding, including arrangement of emergency routes and the beach operation, and arranging the interface with the Boqeq River and the promenade from Road 90.
Planned end date: november 2015
Arranging and increasing water flow in the Boqeq River water carrier and canal to the flow of the hydrological envelope in accordance with the new standards, with an emphasis on its integration in the environmental landscape and suiting its level to the fixed level and the hotels road.
Planned end date: november 2015
Elevating and expanding the Isrotel public beach battery to the fixed level including arrangement of the drainage infrastructure and landscape rehabilitation of the beach and making it accessible to bathers.
Planned end date: September 2015
Elevating and expanding the International public beach battery to the fixed level including arrangement of the drainage infrastructure and landscape rehabilitation of the beach and arranging the interface between the elevated beach batteries.
Planned end date: november 2015
Arranging the drainage, electricity and communication infrastructure, landscape rehabilitation and arrangement of roads in the hotels road between the Boqeq River Bridge and the Isrotel Hotel.
Planned end date: third quarter of 2016
Elevation and expansion of the public beach battery at Ein Boqeq between the Lot Hotel (to the south) and the Solarium (to the north) and the fixed level including arrangement of the drainage infrastructure in the beach area, landscape rehabilitation of the beach and arranging the interface between the structures bordering on the elevated beach battery, arranging drainage infrastructure and adapting the public parking lots to the constraints of the new beach battery including the elevation of electricity and water infrastructures, relocation of a sewage pumping station and improving the efficiency of the groundwater lowering alignment in the region.
Planned end date: third quarter of 2016
Elevation of public beach battery at Hamei Zohar with adaptation to the permanent level, landscape reconstruction of the beaches and protecting them from flooding.
Planned end date: november 2015