Elevation of public beaches for the four Ein Boqeq hotels
Status הסתיים
Elevation and expansion of the public beach battery at Ein Boqeq (from the Hod Hotel beach to the Lot hotel beach) to the permanent level including arrangement of drainage infrastructure and a clay barrier in the beach region, landscape rehabilitation of the beach and making the beach accessible in accordance with the rules of the Ministry of the Interior and the relevant accessibility standards.
Period of execution: 2014