Arrangement of Park Dekalim drainage outlet
Status הסתיים
A project combining tourism development of an amphitheater at Ein Boqeq which combines the engineering functionality of a reservoir and a pumping station for floods, preparation of plumbing infrastructures for the future drainage system and performance of a drainage route from Park Dekalim to Boqeq River.
Period of execution: 2009-2011