Establishment of groundwater lowering systems at Leonardo Club and Leonardo Plaza (Herods) hotels’ p
Status הסתיים
Establishment and upgrading of systems and infrastructure for groundwater lowering to the permanent level to protect the hotels’ foundations, installation of about 50 pumps for lowering groundwater, including electricity and water plumbing infrastructures around the hotels, piezometers, electrical backup and control system.
Period of execution: 2013-2014