Elevation and expansion of Ein Boqeq public beach
Status בביצוע
Elevation and expansion of the public beach battery at Ein Boqeq between the Lot Hotel (to the south) and the Solarium (to the north) and the fixed level including arrangement of the drainage infrastructure in the beach area, landscape rehabilitation of the beach and arranging the interface between the structures bordering on the elevated beach battery, arranging drainage infrastructure and adapting the public parking lots to the constraints of the new beach battery including the elevation of electricity and water infrastructures, relocation of a sewage pumping station and improving the efficiency of the groundwater lowering alignment in the region.
Planned end date: third quarter of 2016